Construction of a total gut rehab of Whiting Hall is underway.  Shot of the new elevator shaft.

The dorm will be ready for occupancy August 2014. The new design will provide a common lounge at the west end on grade within the existing addition. A tower will be renovated to provide ADA access to all levels and as well as a second stair.  Rehab will be done to the existing shell to provide new insulation, systems and design improvements. 

The connection ot the Res Tri will occur with an added western porch and canopy with walkways to the promenade.

conceptual design

During construction the infirmary will be temporarily housed in a modular unit (the MASH unit) in Skiff Parking lot. 

MASH unit