Whiting Hall



Gut rehab

The dorm was ready for occupancy August 2014. The new design provides a common lounge at the west end on grade within the existing addition. A tower was renovated to provide ADA access to all levels and as well as a second stair.  Rehab was done to the existing shell to provide new insulation, systems and design improvements. 

The connection ot the Res Tri will occur with an added western porch and canopy with walkways to the promenade.

conceptual design